By Tim King · Updated
Decimal Hours Converter
Hours and Minutes to Decimal Hours for Payroll and Timesheets
OneTask is free, with no sign-up, and built by one person.
If this tool saved you time, a coffee helps keep new ones coming.
How the Decimal Hours Converter works
This decimal hours converter turns hours and minutes, such as 7:45 or 7h 45m, into decimal hours, such as 7.75, and turns decimal hours back into hours and minutes. Use it to fill in a timesheet, check a payslip or bill a client by the hour.
Clocks count in sixties and money counts in hundreds. Payroll and invoicing systems multiply hours by a rate, so they need time written as an ordinary decimal number. A shift of 7 hours 45 minutes is 7.75 hours, not 7.45, and the difference matters: at 20 an hour, reading 7:45 as 7.45 costs the worker 6 in a single day.
How decimal hours work
A decimal hour expresses the minutes as a share of sixty. Divide the minutes by 60 and add the result to the whole hours.
- 7 hours 45 minutes is 7 + 45 ÷ 60 = 7.75.
- 2 hours 20 minutes is 2 + 20 ÷ 60 = 2.333…, usually written 2.33.
- 38 hours 10 minutes is 38 + 10 ÷ 60 = 38.17 to two places.
Going the other way, multiply the fraction by 60. For 6.4 hours, 0.4 × 60 = 24, so 6.4 hours is 6 hours 24 minutes. The converter rounds to the nearest whole minute in that direction.
Reading the result
Converting to decimal gives three readings:
- Decimal hours rounded to two places, which is what most payroll and billing systems store.
- Exact to six places, for when two places is not enough, such as 20 minutes, which is a repeating 0.333….
- Total minutes, handy for systems that log time in minutes.
Seconds are accepted too, as in 1:30:45, and count as a fraction of a minute. Converting from decimal gives the h:mm form, the same thing in words, and the total in minutes and seconds.
Minutes to decimal chart
The chart below the result lists every three minutes from 0 to 57 as decimal hours. Six-minute steps are worth remembering, because each one is exactly a tenth of an hour: 6 minutes is 0.1, 12 is 0.2, 18 is 0.3 and so on. Many law firms and consultancies bill in these six-minute units for exactly that reason.
The quarter hours are the other set worth knowing by heart: 15 minutes is 0.25, 30 is 0.5 and 45 is 0.75.
Rounding and why two places is not always exact
Most minute values do not divide neatly into hundredths. Twenty minutes is 0.3333…, and two places gives 0.33, which is 19.8 minutes. Over one shift the error is a fraction of a minute, but some systems round each entry and then add them up, and others add the exact values and round once at the end. Over a month of daily entries the two methods can differ by a few minutes.
If a payslip seems a little off, convert each day with the exact reading and add them, then compare with the payroll total. A difference of a few hundredths is rounding. A difference of a tenth or more on one day usually means a time was entered as 7.45 instead of 7.75.
Typical uses
- Entering hours into payroll software or a spreadsheet that expects numbers.
- Invoicing hourly work, where the rate is multiplied by decimal hours.
- Reading back a timesheet export that shows 37.5 and wondering what that is on a clock: 37 hours 30 minutes.
- Checking a contractor's bill against their logged time.
- Planning overtime, where a rate of 1.5 times is applied to decimal hours above a threshold.
Spreadsheet tip
In Excel, LibreOffice and Google Sheets, a time such as 7:45 is stored as a fraction of a day, 0.3229. Multiply it by 24 to get decimal hours, and format the cell as a number rather than a time. To go back, divide decimal hours by 24 and format the cell as [h]:mm. The square brackets let totals run past 24 hours instead of wrapping round to zero, which is one of the most common timesheet spreadsheet errors.
Input formats accepted
Hours and minutes can be typed as 7:45, 7:45:30, 7h 45m, 7h or 45m. Minutes and seconds must be 59 or less. Decimal input takes a plain number such as 7.75 or .5.
How many hours each block of minutes is
The formula is decimal hours = minutes ÷ 60. For example, 45 minutes is 45 ÷ 60 = 0.75 hours, so 7 hours 45 minutes is 7.75. Each example below is rounded to two decimal places, which is what most payroll systems store.
Minutes as decimal hours
| Minutes | Decimal hours |
|---|---|
| 3 minutes | 0.05 |
| 6 minutes | 0.1 |
| 9 minutes | 0.15 |
| 12 minutes | 0.2 |
| 15 minutes | 0.25 |
| 18 minutes | 0.3 |
| 21 minutes | 0.35 |
| 24 minutes | 0.4 |
| 27 minutes | 0.45 |
| 30 minutes | 0.5 |
| 33 minutes | 0.55 |
| 36 minutes | 0.6 |
| 39 minutes | 0.65 |
| 42 minutes | 0.7 |
| 45 minutes | 0.75 |
| 48 minutes | 0.8 |
| 51 minutes | 0.85 |
| 54 minutes | 0.9 |
| 57 minutes | 0.95 |
| 60 minutes | 1 |
FAQ
How do I convert 7 hours 45 minutes to decimal?
Divide the minutes by 60 and add them to the hours: 45 ÷ 60 is 0.75, so 7 hours 45 minutes is 7.75 decimal hours. Enter 7:45 or 7h 45m in the converter to get the same answer.
What is 0.1 of an hour in minutes?
One tenth of an hour is 6 minutes, because 0.1 × 60 = 6. That is why many professionals bill in six-minute units: each unit is exactly one decimal place, which keeps invoices simple.
Why does my payslip show 7.45 when I worked 7:45?
Someone has probably typed the clock time straight into a decimal field. 7.45 hours is only 7 hours 27 minutes, so 18 minutes are missing. Ask for it to be corrected to 7.75 decimal hours.
How many decimal places should I use?
Two places is standard for payroll and invoicing and is accurate to within about 18 seconds. Use the exact reading when adding many entries, then round once at the end to keep totals accurate.
See also: all Durations tools, Calendars, Countdowns, Work and Contracts, Date Formats, Time Zones and Travel, Sun and Daylight.
Related tools
Hours Calculator
Hours between two times, minus breaks, with overnight shifts.
Timesheet Calculator
Total a week of shifts with overtime and gross pay.
Time Calculator
Add and subtract hours, minutes and seconds in one line.
Hours To Minutes Converter
Convert between seconds, minutes, hours, days and weeks.
"As Seen In" Strip
Build a muted "as seen in" row of press and media logos.